Rudder Build 04

posted in: All, Rudder | 0

After the rudder’s final form was achieved…

16 Rudder closed

 

 

 

 

 

 

I closed the bottom part…

18 Bottom part closed with 8mm plywood

 

 

 

 

 

 

Then epoxied the RVS bar in place…

17 Rudder closed & RVS bar installed

 

 

 

 

 

 

AndĀ filled the bottom part of the rudder with closed cell foam…

19 Foam poured

 

 

 

 

 

 

This product is easy to use. 2 K foam, mix the 2 parts in equal amounts, stir and pour.

That’s it !!

Leave a Reply